Our client is seeking an experienced Production Manager to join their team.
-
Ensure that no milk remains in a raw milk silo for more than 24 hours and that no milk remains in a processed milk silo for more than 60 hours (2.5
days).
-
Ensure that milk is processed according to the standards laid down by the relevant Food safety and HACCP procedures.
-
Processed products comply with legislated standards in terms of Pasteurisation, Butterfat%, freezing point and micro results.
-
Butterfat of processed product to be tested every 30 minutes.
-
Daily diversion valve testing (CCP) is conducted, monitored and recorded.
-
Records are to be reviewed daily, signed off and filed.
-
Ensure that sufficient stock of each product type is processed and packed every day, dependant on milk supply.
-
Ensure there is sufficient packaging to meet the demand for products.
-
Ensure production stock items such as Freeze Dried Culture never fall below minimum stock levels.
-
All packaged products comply with legislated standards in terms of micro results.
-
Packaging and production losses are to be kept within the agreed target.
-
Ensure that there is sufficient packaging material stock levels at all times.
-
Ensure that the production stock controller captures the correct stock figures and that these are then captured onto D3.
-
Reconcile all production stock daily and at month end.
-
Monitor raw milk levels and inform relevant people if any supply constraints appear.
-
Start packing at 07:00 am.
-
Monitor that the correct expiry dates and batch codes are printed on each product daily to ensure full traceability of the product.
-
Ensure that each product is packed in correctly labelled packaging.
-
Packaging suppliers to have fully traceability of their packaging linked to DDD batch codes and or for date of packing.
-
To ensure that a full Product recall can be conducted using the batch code.
-
Suppliers of packaging to provide COA’s for all packaging material use.
-
MSDS and Technical data to be provided by all Packaging material suppliers.
-
On filling, caps are seated correctly to prevent leaking.
-
Machine operators check that the weights are correct at start up.
-
Under filled and uncapped bottles to be removed and the product set aside for reworking.
-
No manual capping of bottles unless it is due to a breakdown capping must then be closely monitored, supervised and documented.
-
Employees capping must:
-
First wash hands and sanitise.
-
Not to touch bottle neck thread.
-
Only be responsible for capping.
-
Not pick up, touch or pack crates.
-
No manual topping up of bottles.
-
Correct CIP programmes to be used for cleaning of the various processing plant equipment, silos and tanks.
-
CIP samples are to be sent to the Laboratory to be checked.
-
Supervise that manual cleaning is done as per cleaning schedules and procedures to ensure equipment is clean and to prevent contamination of product in processing and packaging.
-
Ensure that the correct colour coded brushware is available and used for cleaning.
-
Correct chemicals and dilutions are used for:
-
Balance tank dosing.
-
Sanitiser Baths.
-
Foamer.
-
Machine operators are held responsible for cleaning their own machines and areas between products and at the end of each day.
-
Pipes and nozzles are cleaned before being placed in the sanitiser baths. All air must be removed from the pipes when placed in the Baths.
-
Supervise that pre production, filling machine pipes and nozzles are sanitised prior to set up and Machine is then steamed.
-
Weekly deep cleaning of all filling machines and butter machine, conveyors and surfaces.
-
Incoming pallets are clean.
-
To be familiar and comply with Production, Food Safety/HACCP and other relevant Company policies and procedures.
-
Monitor employees to ensure that they adhere to the policies and procedures.
-
Ensure that the daily, weekly & monthly checklists are completed as required:
-
CIP.
-
CCP monitoring of pasteurisation times and temperatures.
-
Temperature monitoring of raw and processed milk silos.
-
Cleaning checklists for tankers, CIP, processing plant, production areas and filling machines.
-
Product traceability.
-
Personal hygiene register and that all staff are checked daily to ensure that they comply.
-
Glass and hard plastic controlled and monitored and recorded.
-
Liaise with the Technical manager to ensure there is a service & maintenance plan for all plant equipment within your department.
-
Inform Technical department of plant break downs timeously.
-
Liaise with Technical Manager regarding timing of planned and unplanned plant servicing.
-
Maintaining control of tools, lubricants and toners that are used by factory staff during production.
-
Ensure that all new employees attend the relevant Food Safety and HACCP training.
-
Annual food safety refresher training to be attended by all staff.
-
No new or temporary employee is to be permitted to work in the factory unless they have received at least the following training:
-
To keep updated with relevant industry changes.
-
Plan and request training for staff or for self development.
-
To fully understand the workings of the D3 software program, relevant to the running of the department including:
-
Show commitment to the Food Safety management system.
-
Required to be an active team member of the Food Safety and HACCP team.
-
To participate in Food Safety and HACCP Meetings and Management Reviews.
-
To uphold all Food Safety policies and procedures and HACCP principles.
-
Attend training in relation to Food Safety.
-
To ensure:
-
Compliance of all staff to all Food Safety and HACCP policies and procedures.
-
Product traceability at all times.
-
Root Cause Analysis is conduct and implement Corrective Actions for food safety and CCP non-conformances.
-
All staff reporting to you attend food safety training.
-
Participate in 3rd Party audits conducted by:
-
All employees to have job descriptions and key performance areas.
-
All employees Time and Attendance hours are verified and overtime authorised on D3.
-
Time sheets to be completed and signed off for all staff not on clocking system.
-
Employees leave to be monitored and planned for the year.
-
Comply at all times with the sick leave policy & leave policy.
-
All employees have performance reviews at least annually.
-
Ensure all disciplinary issues that relate to your department are dealt with including correctly corrective counselling and arranging disciplinary hearings with assistance of HR Manager.
-
Document and record all counselling and verbal warnings for future reference.
-
To be consistent and fair when disciplining staff.